How do you begin? This is the question every builder, investor or municipality asks when they need a timber structure. We offer two options — a structure you assemble yourself, or a complete module, finished and assembled by us. Below you will find the steps we take together, whichever option you choose.

We are a timber-structure factory, not a construction company. We produce everything in our own facility — wood dried in our own kiln, cut and planed on 4 sides on our Weinig line.

What we deliver

Option 01

Structure

Wall and floor panels, ready to assemble on your site.

  • Wall and floor panels, roof structure
  • Cut on our Weinig line, numbered elements
  • Assembly plan and parts list
  • Assembly stays with you or your own team
Option 02

Complete module

Volumetric module finished in our facility, delivered and positioned by us.

  • Module finished in our facility — structure, insulation, joinery, interior finishes
  • Utilities prepared for connection
  • Transport and lowering with our own crane
  • Assembly (positioning and joining the modules) is included, done by our team

The steps you will follow

  • 1
    Set a budget

    Tell us how much you would like to invest, and we will recommend the solutions that fit it.

  • 2
    Choose or adapt a plan

    We start from one of the models in our portfolio, or from your own plan. Our design team adapts it and prepares the final technical documentation.

  • 3
    We move into production

    The structure or module is produced in our own facility, using wood dried in our own kiln. We keep you updated with photos from every stage.

  • 4
    We deliver — or assemble

    The structure arrives numbered, with an assembly plan, at your site's gate. The complete module is transported and assembled by us, on site.

How we work together

Depending on the size of the construction, we can suggest a few plans as a starting point. We discuss them together, then our design team prepares the final plans.

We then send you the price — depending on the option chosen, the amount of wood used, the complexity of the project and the equipment required — broken down by stage, together with transport details.

Throughout production, we keep you updated with photos from every stage, so you always know where your project stands.

Payment method

Structure

10%At the start of design
40%At the start of production
50%Before delivery

Complete module

50%At the start of design
40%At the start of production
10%After assembly

Need more details or an indicative price? Get in touch through our contact form.