County
Dâmbovița
Beneficiary
A city hall in Dâmbovița County
Year
2026
01 — The Challenge
Tight deadline, complex project
The challenge was the very tight deadline and the complexity/scale of the project — the need to prepare the project for execution in a very short time and to optimize the production flow to complete the houses within just as short a timeframe.
02 — The Solution
Prefabricated structures, fast delivery
Timberframe structure made of softwood, dried in-house in the De-Narde drying chamber, and four-side planed on the Weinig machine.
03 — The Result
Fast production, on-time delivery
The concrete result, shown exactly below.
"The structure for 10 P+2 housing units, produced in the factory in 3 months. Assembly was carried out by the beneficiary."
Production, step by step
Images from the real production process — from raw material to the finished element, ready for delivery.
Do you have a similar project?
We can present you the technical solution and an estimated delivery timeline.